Vertical progress bar
Permalink
http://lakerotoruaincentives.nz/concrete5.6.3.3/index.php?cID=143
I have an elaborate setup for a progress bar. The red fill in the 'N' should reduced down as the target is met. But I need the client to easily alter this. Can't figure out the best route to take (bearing in mind that I am not a programmer but a front end web guy!).
Any ideas?
I have an elaborate setup for a progress bar. The red fill in the 'N' should reduced down as the target is met. But I need the client to easily alter this. Can't figure out the best route to take (bearing in mind that I am not a programmer but a front end web guy!).
Any ideas?
You could make a block with a text field input for the meter level. The input would set the level of the span height. The client could edit the block and change the number to update the meter level.
Example: the block view.php