Moving site from dev to prod

Permalink
I finished a clients site and will be moving it to the their hosting account. I wanted to determine if their is any additional Concrete5 directories I should clear before moving the site.

I am currently planning to do the following:

1. Disable Pretty URL's
2. Clear the cache
3. Remove old page versions

Is their any tmp directories in the C5 installation I should clear before the move?

Since this is the first site I will have built and moved to a clients hosting account I wanted to determine best practices.

Thanks,

SteadyIT
 
PineCreativeLabs replied on at Permalink Best Answer Reply
PineCreativeLabs
Inside your root "files" directory, you will want to empty the following sub-directories:

/files/cache
/files/tmp
/files/trash

Also, remember to backup the database, too!